MIT Libraries logoDSpace@MIT

MIT
View Item 
  • DSpace@MIT Home
  • Singapore-MIT Alliance (SMA)
  • Innovation in Manufacturing Systems and Technology (IMST)
  • View Item
  • DSpace@MIT Home
  • Singapore-MIT Alliance (SMA)
  • Innovation in Manufacturing Systems and Technology (IMST)
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

A Model for Contingent Manpower Planning: Insights from a High Clock Speed Industry

Author(s)
Bhatnagar, Rohit; Venkataramanaiah, S.; Rajagopalan, Anand
Thumbnail
DownloadIMST013.pdf (183.5Kb)
Metadata
Show full item record
Abstract
Intense competitive pressures have led to compressed product life cycles and frequent introduction of new products. This creates demand volatility and a consequent pressure on manufacturing to meet this variable demand. In this paper we model the manpower planning issues for a computer manufacturer during the product introduction phase when a quick ramp-up of production to meet rapidly increasing demand is a key requirement. A mix of permanent and contingent workers with different skill sets is considered. Some important issues addressed in this research are (a) how to assign workers with different skills to maximize production (b) what is the induction rate of contingent workers to achieve the desired ramp-up and (c) what are the key decision factors that impact manufacturing performance An LP model is proposed to minimize overall costs subject to complex scheduling, skills, and learning rate requirements. Our analysis indicates that cost of induction of contingent workers, overtime cost premium, and the amount of overtime have significant impact on performance. The findings of the study will be useful to managers in planning and allocation of workers of different skills to various manufacturing processes and to determine the optimal number of contingent workers to induct.
Date issued
2003-01
URI
http://hdl.handle.net/1721.1/3747
Series/Report no.
Innovation in Manufacturing Systems and Technology (IMST);
Keywords
contingent workers, demand ramp-up, manpower planning

Collections
  • Innovation in Manufacturing Systems and Technology (IMST)

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

Login

Statistics

OA StatisticsStatistics by CountryStatistics by Department
MIT Libraries
PrivacyPermissionsAccessibilityContact us
MIT
Content created by the MIT Libraries, CC BY-NC unless otherwise noted. Notify us about copyright concerns.